Contract scope: construction of a copper cathode plant using concentrate bioleaching with a capacity of 50,000 t/y.

Summary of AriaHangard's scope

  • Detailed design and engineering, preparing drawings and documents for all disciplines
  • Procurement engineering: TBEs based on technical offers, MRs and the overall supply schedule
  • Equipment manufacturing supervision and inspection: in-process and final inspections and test witnessing
  • Site supervision: supervision of installation and commissioning according to the schedule